Uranium Mine. Field study, field campaign and laboratory tests
Client
Berkley Minera España S.A
Duration
2025
State
In development
June 30, 2026

The objective is to document in order to recommend the design parameters of the foundations of the different structures, facilities and waste dumps planned in the exploitation projects.
To achieve the objective it is necessary:
- Continuous witness survey campaign
- Field trials
- Laboratory tests.
A field campaign that includes carrying out:
- Calicatas
- Drilling with core recovery
- CSW seismic profiles
- SPT tests
- Taking soil samples and CBR tests in the conveyor belt implementation section
- Carrying out laboratory tests.