Uranium Mine. Update of the project and restoration plan
Client
Berkley Minera España S.A
Duration
2025
State
In development
June 30, 2026

Document various updates to the Project, taking into account:
- Exploitation design, based on new data from the pre-feasibility study.
- Optimisation of the pit, comparing the results with those of the SRK study.
- Planning of exploitation and backfilling, as a consequence of the increase in the surface area of the piles and the decrease in intermediate stockpiles.
- Alternative locations for the treatment plant and leaching heaps. Justification of the solution adopted.
- Design of leach pads and waste dumps.
- Water management.
The work to be carried out are modifications in:
- Exploitation project and its annexes
- Restoration plan taking into account the modifications of the Exploitation Project and the Environmental Study